add full submission suite of DBS, APR, and PPT + PDF

This commit is contained in:
Benzi
2026-10-18 20:15:17 -04:00
parent 804c75623e
commit 11e54332fc
275 changed files with 1137689 additions and 0 deletions
+30
View File
@@ -0,0 +1,30 @@
###############################################################
# Generated by: Cadence Innovus 25.11-s102_1
# OS: Linux x86_64(Host ID ece-rhelsrv)
# Generated on: Sun Oct 18 17:47:16 2026
# Design: chip_top
# Command: verifyConnectivity -type all -error 10000 -warning 500 -report /nethome/dbenzi3/physical-design-onboarding-F26/outputs/apr/RPT/chip_top.conn.rpt
###############################################################
Verify Connectivity Report is created on Sun Oct 18 17:47:16 2026
Multi-CPU acceleration using 8 CPU
Use pthread
Net VDD: has special routes with opens at (9.600, 9.460) (1279.400, 644.400)
Net VDD: has regular routing with opens at (643.135, 207.770) (645.055, 209.575)
Net VSS: has special routes with opens at (0.000, 0.000) (1289.000, 654.000)
Net VSS: has regular routing with opens at (643.815, 477.510) (644.375, 479.775)
Net VSS: has regular routing with opens at (643.135, 202.770) (645.055, 204.350)
Net VSS: has regular routing with opens at (643.135, 181.815) (645.055, 183.395)
Net VSS: has regular routing with opens at (643.135, 186.815) (645.055, 188.395)
Begin Summary
2 Problem(s) (IMPVFC-200): Special Wires: Pieces of the net are not connected together.
5 Problem(s) (IMPVFC-92): Pieces of the net are not connected together.
7 total info(s) created.
End Summary